if a job is ahead of schedule, then its critical ratio (cr) will be group of answer choices greater than one. less than one. equal to one. none of these answer choices is correct.

Respuesta :

If a job is ahead of schedule, then its critical ratio(CR) will be greater than one.

Critical Ratio(CR)

A dispatching rule that divides the time left before the due date by the anticipated amount of time needed to complete the task to arrive at a priority index number. Ratios below 1.0 are typically considered to be behind schedule, whereas ratios above 1.0 are considered to be ahead of plan, and a ratio of 1.0 is on schedule.

Explanation:

The critical ratio (CR) is a measure of the progress of a project relative to its timeline. When a job is ahead of schedule, the amount of work completed is greater than the amount of work planned for the same period of time, resulting in a CR that is greater than one. This indicates that the job is progressing faster than expected and is ahead of schedule.

To know more about Critical ratios visit here:

https://brainly.com/question/20164132

#SPJ4