The total meters in the wall which is build by a construction company at a rate of 30 cm of the wall per minute, is 16 meters.
The total time taken is inversely proportional to the rate of work. If a unit of work is done in total n number of days, then the total work done in a day can is,
W=1/n
A construction company is building a wall. The company can build 30 cm of the wall per minute. In 40 minutes the total cm of wall build by company is,
n=40/30
n=1200 cm
n=12 m
After 40 minutes, three fourth of the wall is completed, which is equal to the 12 meters. Thus, the total meter of the wall is,
(3/4)x=12
x=(12x4)/3
x=16 m
Thus, the total meters in the wall which is build by a construction company at a rate of 30 cm of the wall per minute, is 16 meters.