4. In the Hyatt Regency walkway case study, it is reported that Jack Gillum stamps the 42 shop drawings, including the revised Shop Drawing 30 and Erection Drawing E-3 denoting the revised hanger connection detail, with his engineering review seal, authorizing construction. When stamping these drawings, what is Jack Gillum accepting? A one-word response is sufficient.