Answer:
option F
Step-by-step explanation:
given,
capacity of tank = 1000 gallon
volume of water leak = 300 gallon
time = 30 min
water is leaking at the rate
formula used
[tex]A = B e^{-kt}[/tex]
At t = 0 A = 1000 gallons
[tex]1000= B e^{-k\times 0}[/tex]
B = 1000
[tex]A = 1000 e^{-kt}[/tex]
at t = 30 A = 700
[tex]700= 1000 e^{-k\times 30}[/tex]
[tex]e^{-k\times 30}=0.7[/tex]
taking ln both side
[tex]-k\times 30=ln(0.7)[/tex]
[tex]k=-\dfrac{ln(0.7)}{30}[/tex]
now,
[tex]A = 1000 e^{\dfrac{ln(0.7)}{30}t}[/tex]
[tex]A = 1000\times 0.7 e^{\dfrac{t}{30}}[/tex]
[tex]A = 700 e^{\dfrac{t}{30}}[/tex]
hence, the correct answer is option F