Tally Company uses job costing. The job cost record for Job A61 on March 1 showed a balance of $5,200. The job was completed on March 16. During March materials requisitions for this job were $2,300. Labor time records for this job in March were $4,000. Manufacturing overhead is allocated based on direct labor cost. The rate is 90% of direct labor cost. How much is the total cost of Job A61?