Carmen wants to install a fence . each section of fence is 2.4 metres long and cost $6.00 pre metre. Carmen will need 16 section of fence. how much change he receive from $250?
For this case, the first thing we must do is calculate the total cost. We have then: C = (16) * (2.4) * (6) C = 230.4 $ Then, the change it receives is given by: 250 - 230.4 = 19.6 $ Answer: He has received 19.6 $ from $ 250