Gorman Construction Company Gorman would like to determine the route that will minimize the total travel distance between company’s office (located at node 1) and the construction site located at node 2.


a. Determine the route
b. Minimize total travel distance
c. Company’s office located at node 1
d. Construction site located at node 2