elizabethtapp45551 elizabethtapp45551 14-05-2023 Business contestada if the the specification for a critical part in the process is 2.5 0.1 and the standard deviation for the process is 0.025, at what sigma level this process is operating? Select one: a. 4 b. 3.4 c. 0.20 d. 2.5