the glendoe hydroelectric plant in scotland has a catchment area for rainfall of 75 km^2, and the annual rainfall is approximately 2m. the difference in elevation between the water reservoir and the turbine is 630m. the plant produces about 180 gwh of electrical energy per year. estimate its efficiency - the ratio of produced electrical energy to energy stored in the water.